Projects

Four-laning of NH-39 Dimapur- Kohima Road

Construction of Four Laning of part of Ramban to Banihal Section of NH-1A

Construction of Balance work of 2 Lane with Paved Shoulder of Joram Koloriang Road (NH-713)

Holongi to Itanagar section of NH-415

Bhagalpur - Kahalgoan- Mirzachowki section in the State of Bihar

Construction of Mitigation Measures structures on CH/MH Border to Wainganga Bridge Section of NH-6

Construction of four-lane Greenfield Amritsar connectivity for Connection of Amritsar with Delhi-Amritsar-Katra Expressway

Rimuli -Koida section in the state of Odisha

Rehabilitation and up gradation of Two Laning with Paved Shoulder for Jind to Gohana Section

Rehabilitation and up gradation of 2-lane with paved shoulder for Jind Kamal Section

Balance work of 4-laning of Indore-Gujarat/MP Border-Machilya Ghat Section

FOUR LANING OF PINJORE (END OF PINJORE BYPASS) – NALAGARH SECTION

Upgradation of Gurgaon-Pataudi-Rewari section of NH-352W

Delhi – Vadodara Green Field Alignment (NH-148N) on EPC Mode Under Bharatmala Pariyojana in the State of Madhya Pradesh (Pkg-25)

Delhi – Vadodara Green Field Alignment (NH-148N) on EPC Mode Under Bharatmala Pariyojana in the State of Madhya Pradesh (Pkg-23)

Delhi – Vadodara Green Field Alignment (NH-148N) on EPC Mode Under Bharatmala Pariyojana in the State of Madhya Pradesh (Pkg-24)

Eight Lane access-controlled expressway section of Delhi - Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat- Project. (Package-30)

Development of entry & exist service road Aligarh

Identification of Blackspot locations in Anakapalli to Gundugolanu section

Prioritization Of Blackspots And Piloting Improvement in Rajasthan

Agra-Etawah bypass section of NH-2

Carrying out Independent Road safety audit in selected stretches of different National Highways within the state of Assamm upto DPR Preparation

MEGHALAYA (PACKAGE-2)

MEGHALAYA (PACKAGE-1)

Vadodara-Mumbai Expressway

Construction of Etawah-Chakeri, Kanpur-Kabrai & Bara-Orai

Construction of Four lane elevated road as part of under construction Ganga Path

Widening and strengthening of Bongaon – Chakdah Road (SH-1)

Development of multi-lane carriageway

Construction of flyover from Liberty cinema to Mental Hospital on Nagpur Obedullaganj Road NH-69

Construction of VUP at Balikuda, Sikharpur and Badchana on Chandikhole-Jagatpur-Bhubaneswar Section of NH-5

Construction of Six lane Minor Bridge (Paloli Palam)

Construction of VUPs at km. 11.330 (Kalabadia Chowk)

Four laning of Aligarh- Kanpur section of NH-91

Operation & Maintenance of 4 Lane Jalandhar to Pathankot /J&K Border

Four laning of Pathankot to Amritsar section of NH-15

Four Laning of Ludhina to Talwandi section of NH-95

Technical Assessment of the corridors in Punjab/Rajasthan

Lokhandi-Sawargaon-Renapur Section of SH-232

Bhokardhan-Jawkheda-Deaulgaon Raja Road

Kabrai-Banda Section of NH-76

Mau – Jasra Section of NH-76

Kalupur–Lalata Section of of NH-76

Multi Sector Road Safety Strategy

Biharsharif-Barbigha-Mokama Section of NH-82

Zirakpur-Patiala Section of NH-64 (PKG-II)

Zirakpur-Patiala Section of NH-64 (PKG-I)

Tapa-Bathinda Section of NH-64

Rudauli to Ghaghara Bridge on NH-233

Bhalgarh Flyover & Major Bridge

ROB Dabwali

Jam-Warora Section of SH-264

Lokhandi-Sawargaon-Renapur (Latur) Road

Construction of Balance work of 2 Lane with Paved Shoulder of Joram Koloriang Road (NH-713)

Construction of Balance work of 2 Lane with Paved Shoulder of Joram Koloriang Road (NH-713) on EPC Basis From Existing Km 138.00 to Km 158.00 (Design Km 122.353 to Km 138.389) Design Length 16.036 Km in the State of Arunachal Pradesh Under SARDP-NE

Client : SPS Technocrats Pvt. Ltd.

Construction of four-lane Greenfield Amritsar connectivity for Connection of Amritsar with Delhi-Amritsar-Katra Expressway

Construction of four-lane Greenfield Amritsar connectivity for Connection of Amritsar with Delhi-Amritsar-Katra Expressway from Junction with NH3 and Taran taran Bypass near Mannawalla village chainage 70+950 to Junction with NH354 Ajanala road near Harsh china village chainage 99+020 (km 70.950 to km 99.020 of Amritsar connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab

Client : SPS Technocrats Pvt. Ltd.

FOUR LANING OF PINJORE (END OF PINJORE BYPASS) – NALAGARH SECTION

CONSTRUCTION OF FOUR LANING OF PINJORE (END OF PINJORE BYPASS) – NALAGARH SECTION FROM KM 4+200 TO KM 35+395 ON NH- 105 (OLD NH-21A) IN THE STATE OF HARYANA AND HIMACHAL PRADESH ON EPC MODE UNDER BHARATMALA PARIYOJNA

Client : SPG /NHAI

Eight Lane access-controlled expressway section of Delhi - Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat- Project. (Package-30)

Construction of Eight Lane access-controlled expressway from junction with SH-175 near Baletiya village of Panchmahal district to junction with SH-63 near Pratap Nagar village of Vadodara district (Ch. 803+420 to 824+920; design Ch. 351+000 to Ch. 372+500) section of Delhi - Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat- Project. (Package-30).

Client : Patel Infra. Ltd /NHAI

Identification of Blackspot locations in Anakapalli to Gundugolanu section

Preparation of feasibility / DPR to take up the long-term measures by providing LVUP/VUP/Service Roads/Junction Improvement/Solar Blinkers/Highway Lighting for rectification of 11 Nos of MORTH identified Blackspot locations in Anakapalli to Gundugolanu section from Km. 741.255 to Km 1022.494 in the State of Andhra Pradesh

Client : NHAI

Prioritization Of Blackspots And Piloting Improvement in Rajasthan

Consultancy Services for Prioritization Of Blackspots And Piloting Improvement Of About 20 High-Priority Blackspots in the State of Rajasthan. (Package: WB/RSHDPII/RS/04)

Client : Word Bank /Govt. of Assam

Agra-Etawah bypass section of NH-2

Safety Consultants for Agra-Etawah bypass section of NH-2 from km. 199.660 to km. 323.525, Agra to Aligarh section of NH-93 from km. 153.000 to km. 234.215 on BOT mode, Agra-bypass (Southern) from km. 0+000 to km. 32+800

Client : NHAI

Vadodara-Mumbai Expressway

Appointment of Safety Consultants for Vadodara-Mumbai Expressway from Km 217.500 to Km 292.000, Packages-4,5,6 on HAM (Total Length: 74.50 Km)

Client : NHAI

Construction of Etawah-Chakeri, Kanpur-Kabrai & Bara-Orai

Safety Consultant for 3 Projects (Etawah-Chakeri Section of NH-2 (New NH-19), Kanpur-Kabrai Section of NH-86 (New NH-34) and Bara-Orai section of NH-25 (New NH-27) on BoT Mode

Client : NHAI - Kanpur /Delhi

Four laning of Aligarh- Kanpur section of NH-91

Safety Consultant for Four laning of Aligarh- Kanpur section of NH-91: Packages-IV (from Naviganj- Mitrasenpur ) & Pkg- V (from Mitrasenpur- Kanpur)

Client : NHAI

Operation & Maintenance of 4 Lane Jalandhar to Pathankot /J&K Border

Safety Consultant for Operation & Maintenance of 4 Lane Jalandhar to Pathankot /J&K Border from Km. 4.2303 to km. 117.750 /4.000 to km. 16.350 of NH-1A (OMT 21A)

Client : NHAI

Four laning of Pathankot to Amritsar section of NH-15

Safety Consultant for Four laning of Pathankot to Amritsar section of NH-15 from km. 6+082 to km. 108+502 in the state of Punjab under NHDP Phase III on DBFOT basis (Now NH-54)

Client : NHAI

Four Laning of Ludhina to Talwandi section of NH-95

Safety Consultant for Four Laning of Ludhina to Talwandi section of NH-95 from km. 92+000 to km. 170+00 (Length 78km) in the state of Punjab to be executed on BOT (Toll) on DBFOT basis under NHDP Phase-III

Client : NHAI

Technical Assessment of the corridors in Punjab/Rajasthan

Technical Assessment of the corridors to identify issues impacting the efficiency of the corridors and its design solutions in the state of Punjab.

Client : NHAI

Four-laning of NH-39 Dimapur- Kohima Road

Road Safety Consultancy for Balance work for Four-laning of NH-39 Dimapur- Kohima Road from Design Km 152.490 to Km 166.700 (Existing Km 156.000 to Km 172.900), in the state of Nagaland under SARDP-NE through an Engineering, Procurement and Construction(EPC) Contract (Package-III)

Client : Nexgen Infra Solution

Construction of Four Laning of part of Ramban to Banihal Section of NH-1A

Road Safety Consultancy Services for Construction of Four Laning of part of Ramban to Banihal Section of NH-1A (Now NH-44), from Ch.165+092 to Ch.171+855 (North Bound) and from Ch.166+895 to Ch.173+638 (South Bound), excluding section from Ch.166+610 to Ch.167+150 (North Bound), Ch.168+425 to Ch.168+935 (South Bound) and Section from Ch.167+960 to Ch.168+168 (North Bound), Ch.169+745 to Ch.169+951 (South Bound) (Package-II & Package-III)

Client : Ceigall India Limited and Patel Engineering Limited JV /NHAI

Holongi to Itanagar section of NH-415

Protection & Mitigation of landslide and erosion of road formation from km 10+000 to km 29+5000 of Holongi to Itanagar section of NH-415 on EPC mode in the state of Arunachal Pradesh

Client : SPS Technocrats Pvt. Ltd.

Bhagalpur - Kahalgoan- Mirzachowki section in the State of Bihar

Rehabilitation & Widening work for 2 Lane with paved shouldering of Existing National Highway 80 Alignment from Km. 132.895 to Km. 190.150 Bhagalpur - Kahalgoan- Mirzachowki section in the State of Bihar

Client : SPS Technocrats Pvt. Ltd.

Construction of Mitigation Measures structures on CH/MH Border to Wainganga Bridge Section of NH-6

Construction of Mitigation Measures structures on CH/MH Border to Wainganga Bridge Section of NH-6 (New NH-53) in the State of Maharashtra under Bharat mala Pariyojana on EPC Mode.

Client : SPS Technocrats Pvt. Ltd.

Rimuli -Koida section in the state of Odisha

Construction of New 6-Lane Major Bridge including approaches from Km 172+895 to Km 173+670 of NH-215 (New NH 520) Rimuli -Koida section in the state of Odisha under NHDP phase -III on EPC mode.

Client : PRA BARBRIK PROJECT LIMITED /NHAI

Rehabilitation and up gradation of Two Laning with Paved Shoulder for Jind to Gohana Section

Safety Consultant For Rehabilitation and up gradation of Two Laning with Paved Shoulder for Jind to Gohana Section from existing Km.0+000 to Km 50+505 (Length-50.505km) of NH-352A on EPC Mode under NHDP in the State of Haryana.

Client : E5 Infrastructure Pvt. Ltd. /NHAI

Rehabilitation and up gradation of 2-lane with paved shoulder for Jind Kamal Section

Safety Consultant For Rehabilitation and up gradation of Two Laning with Paved Shoulder for Jind to Karnal Section from existing km.68+660(Design km.68+857) i.e. Junction with Narwana Road(NH-352) at Subhash Chowk and ends at km 153+700(Design 154+219) at ITI Chowk which is interaction with NH-1 of NH-709A in the State of Haryana under NH(O) on EPC Mode(Package-II)

Client : E5 Infrastructure Pvt. Ltd. /NHAI

Balance work of 4-laning of Indore-Gujarat/MP Border-Machilya Ghat Section

Road Safety Consultancy for Balance work of 4-laning of Indore-Gujarat/MP Border from km 106.210 to km 115.250 (Start and end point of Bird Sanctuary), km 121.740 to km 127.140 (Machilya Ghat Section) and Forest portion km 149.800 to km 150.850, km 158.250 to km 158.850 of NH-47 (Old-59) on EPC Mode in the State of Madhya Pradesh

Client : E5 Infrastructure /NHAI

Upgradation of Gurgaon-Pataudi-Rewari section of NH-352W

Upgradation of Gurgaon-Pataudi-Rewari section of NH-352W four laning section from Dwarka Expressway to Rewari (NH-71 Jn.) (Km.0.00 to km.43.87) and six laning section from Hero Honda Chowk to Umang Bhardwaj Chowk (km 0.00 to km 2.240) (Design length 46.11 km) as feeder route under Bharatmala Pariyojana in the state of Haryana on EPC mode.

Client : IRCON /NHAI

Delhi – Vadodara Green Field Alignment (NH-148N) on EPC Mode Under Bharatmala Pariyojana in the State of Madhya Pradesh (Pkg-25)

Construction Of Eight Lane Access-Control Expressway Carriageway from Miyati Village to MP-Gujarat Border (Ch. 673.700 to 696.920; Design Ch.221.350 to 244.500) Section of Delhi – Vadodara Green Field Alignment (NH-148N) on EPC Mode Under Bharatmala Pariyojana in the State of Madhya Pradesh (Pkg-23)

Client : GR-Infra /NHAI

Delhi – Vadodara Green Field Alignment (NH-148N) on EPC Mode Under Bharatmala Pariyojana in the State of Madhya Pradesh (Pkg-23)

Construction Of Eight Lane Access-Control Expressway Carriageway from Miyati Village to MP-Gujarat Border (Ch. 673.700 to 696.920; Design Ch.221.350 to 244.500) Section of Delhi – Vadodara Green Field Alignment (NH-148N) on EPC Mode Under Bharatmala Pariyojana in the State of Madhya Pradesh (Pkg-23)

Client : GR-Infra /NHAI

Delhi – Vadodara Green Field Alignment (NH-148N) on EPC Mode Under Bharatmala Pariyojana in the State of Madhya Pradesh (Pkg-24)

Construction Of Eight Lane Access-Control Expressway Carriageway from Miyati Village to MP-Gujarat Border (Ch. 673.700 to 696.920; Design Ch.221.350 to 244.500) Section of Delhi – Vadodara Green Field Alignment (NH-148N) on EPC Mode Under Bharatmala Pariyojana in the State of Madhya Pradesh (Pkg-24)

Client : GR-Infra /NHAI

Development of entry & exist service road Aligarh

Road Safety Consultancy for Development of entry & exist service road for newly built Wonder Cement Manufacturing Unit along NH-91 (ch. 113+759 RHS) village Somna Tehsil Gabhana district Aligarh U.P.

Client : Wonder Cement Manufacturing Unit

Carrying out Independent Road safety audit in selected stretches of different National Highways within the state of Assamm upto DPR Preparation

Carrying out Independent Road safety audit in selected stretches of different National Highways within the state of Assam

Client : Government of Assam

MEGHALAYA (PACKAGE-2)

Road Safety Audit and Suggesting Improvement of Sharp Curve and Other Necessary Road Safety Measures on the Selected Stretches of National Highways in the State of Meghalaya

Client : Government of Meghalaya

MEGHALAYA (PACKAGE-1)

ROAD SAFETY AUDIT AND SUGGESTING IMPROVEMENT OF SHARP CURVE AND OTHER NECESSARY ROAD SAFETY MEASURES ON THE SELECTED STRETCHES OF NATIONAL HIGHWAYS IN THE STATE OF MEGHALAYA. (PACKAGE-1)".

Client : Government of Meghalaya

Construction of Four lane elevated road as part of under construction Ganga Path

Safety Consultant for Construction of Four lane elevated road as part of under construction Ganga Path (Digha to Deedarganj) from Dulli Ghat (ch. 13+525.79km) to Nuruddin Ghat (Ch. 16+975.79 km), from Dharamshala Ghat (Ch. 19+890km) to Old NH-30 along with connectivity to Ashok Rajpath at Kangan Ghat (Ch. 15+700km) and Patna Ghat (Ch.16+600km) with allied facilities at Patna in state of Bihar on EPC mode.

Client : GR-Infraprojects Ltd. - New Delhi

Widening and strengthening of Bongaon – Chakdah Road (SH-1)

Safety Consultant for widening and strengthening of Bongaon – Chakdah Road (SH-1) from 2-lane with paved shoulder to standard 4-lane configuration from 0+000 to 6+717 km and from 10+568 to 31+328 km, including 2 truck terminals in Phase 1 (Part A, project length of 27.477 km) excluding Gopalnagar ROB and flyover in the district of North 24 Parganas and Nadia

Client : Bharat Vanijya Eastern Pvt. Ltd. Kolkata

Development of multi-lane carriageway

Safety Consultant for Development of multi-lane carriageway from km. 704.200 to km. 723.000 (from Kanhan to automotive square) section of urban link of Nagpur Kamptee section of Nagpur Jabalpur road of NH-44 to be executed on EPC mode.

Client : KCC Buildcon (P) Ltd. -- Gurugram

Construction of flyover from Liberty cinema to Mental Hospital on Nagpur Obedullaganj Road NH-69

Safety Consultant for Construction of flyover from Liberty cinema to Mental Hospital on Nagpur Obedullaganj Road NH-69 in the State of Maharashtra on EPC Basis.

Client : KCC Buildcon (P) Ltd. -- Gurugram

Construction of VUP at Balikuda, Sikharpur and Badchana on Chandikhole-Jagatpur-Bhubaneswar Section of NH-5

Safety Consultant for Construction of VUP at Balikuda, Sikharpur and Badchana on Chandikhole-Jagatpur-Bhubaneswar Section of NH-5 from Km.414.00 to Km.419.00 and Km.0.00 to 62.00 (Length 67.00 Km) in the state of Odisha to be executed as BOT (Till) project on DBFOT Pattern under NHDP Phase V” - under NH-Division, Bhubaneswar (Odisha)

Client : Bansal Infraprojects - Odisa /Raipur

Construction of Six lane Minor Bridge (Paloli Palam)

Safety Consultant for Construction of Six lane Minor Bridge (Paloli Palam) at Km 203.160, Major Bridge (Moorad) at Km 204.895 & allied works like 6 lane Main Carriageway with Service Road for the section Km.203.000 to Km.205.100 (length of 2.1 Km) of NH-17 (New NH-66) under Bharatmala Pariyojna in the State of Kerala on EPC mode.

Client : E5 Infrastructure Pvt. Ltd.

Construction of VUPs at km. 11.330 (Kalabadia Chowk)

Safety Consultant for Construction of VUPs at km. 11.330 (Kalabadia Chowk) and at km. 14.280 (Kuliana village) in Balasore-Baripada-Jharpokharia Section of NH-5 (New NH-18) in the state of Odisha to be executed on EPC Mode.

Client : E5 Infrastructure Pvt. Ltd. /NHAI

Lokhandi-Sawargaon-Renapur Section of SH-232

Safety Consultancy for Rehabilitation and Up-gradation of Lokhandi-Sawargaon- Renapur (Latur) Road from existing km 32+225 to 66+693 (SH-232) (Design km. 32+225 to km 66+688) & Ambejogai Bypass from Existing/Design Chainage 0+000 to km 3+815 (SH 211) Two/Four lane with paved shoulders Configuration in the state of Maharashtra on EPC Mode.

Client : GR-Infra Projects Limited

Bhokardhan-Jawkheda-Deaulgaon Raja Road

Safety Consultancy for Bhokardhan-Hasnabad-Jawkheda-Rajur-Deaulgaon Raja Highway from 0+000 (Kumbhari Fata) to km 63+900 (Deaulgaon Raja) and extension from 17+900E (Jawkheda Fata) to 20+730E (Talegaon Fata) Total 66.730 kms to Two lane with paved shoulders in the state of Maharashtra on EPC Basis Contract.

Client : GR-Infra Projects Limited

Kabrai-Banda Section of NH-76

Safety Consultancy for Rehabilitation and upgradation of from km. 178.000 to 215.000 of NH-76 (Kabrai -Banda) to two lane with paved shoulder on EPC mode.

Client : Centrodorstroy India Pvt. Ltd.

Mau – Jasra Section of NH-76

Safety Consultancy for Rehabilitation and upgradation of from km. 326.000 to 379.555 of NH-76 (Mau – Jasra) to two lane with paved shoulder on EPC mode.

Client : Centrodorstroy India Pvt. Ltd.

Kalupur–Lalata Section of of NH-76

Safety Consultancy for Rehabilitation and upgradation of from km. 285.000 to 326.000 of NH-76 (Kalupur – Lalata Road) to two lane with paved shoulder on EPC mode.

Client : Centrodorstroy India Pvt. Ltd.

Multi Sector Road Safety Strategy

Road Safety & Environmental Studies for Develop Model Safe Corridor Demonstration Program (SCDP) for Implementation of Multi Sector Road Safety Strategy in the Stretch from Jalukbari Police Point to Khanapara Police Point via Road-MG Road-GS Road in the City of Guwahati in Assam, World Bank.

Client : PWRD Assam (Govt. of India)

Biharsharif-Barbigha-Mokama Section of NH-82

Safety Consultancy for Two Laning with paved shoulders of Biharsharif-Barbigha-Mokama Section of NH-82 from Design Chainage km 94.478 (Existing Chainage Km 119.320 of NH-31) to Km 149.053 (Exiting Chainage Km 149.020 of NH-82) [Total Design Length – 54.575 Km] in the State of Bihar on EPC mode.

Client : GR-Infra Projects Limited

Zirakpur-Patiala Section of NH-64 (PKG-II)

Safety Consultancy for Rehabilitation and upgradation of NH-64 from km 28.110 to 50.000 (Zirakpur to Patiala Section) to 4-lane in Punjab on EPC basis.

Client : Centrodorstroy India Pvt. Ltd.

Zirakpur-Patiala Section of NH-64 (PKG-I)

Safety Consultancy for Rehabilitation and Upgradation of NH-64 from km 0.000 to 28.110 (Zirakpur to Patiala Section) to 4 lane in Punjab on EPC,

Client : Centrodorstroy India Pvt. Ltd.

Tapa-Bathinda Section of NH-64

Safety Consultancy for Development to Four-Lanes with paved side shoulders of Tapa to Bathinda section of NH-64 [New NH No. 7] from existing Km 168/0 to Km 209/405 in state of Punjab on Engineering Procurement and Construction (EPC) Mode.

Client : Patel Infrastructure Limited

Rudauli to Ghaghara Bridge on NH-233

Proof Consultancy Services – Proof Checking of All Design & Drawing for the Project of Widening & Strengthening to Two-Lane with paved shoulder of Rudauli (Existing chainage km 66.300) to Ghaghara Bridge abutment on Basti town side, section of NH 233 from km 0.000 (Existing chainage km 0.000) to km 122.270 (Existing chainage km 123.000) in the state of Uttar Pradesh under NHDP Phase– IV on EPC mode.

Client : Vijay Construction (I) Pvt. Ltd.

Bhalgarh Flyover & Major Bridge

Safety Consultancy for Design and Construction of of Bhalgarh Flyover at Km 42 (NH-1) and Major Bridge at Km 32 (NH-1) over Drain No. 8.

Client : Gawar Construction Pvt Ltd

ROB Dabwali

Safety Consultancy for Design and Construction of ROB over Railway crossing No. 32‐B on Bhatinda Suratgarh Railway Line on NH‐10 at km 315.240 in Dabwali Town in State of Haryana.

Client : Gawar Construction Pvt Ltd

Jam-Warora Section of SH-264

Road Safety Audit for Jam Warora SH 264 (Maharashtra) 4 Lane 42 KM

Client : ECA Infrastructure

Lokhandi-Sawargaon-Renapur (Latur) Road

Safety Consultant for Rehabilitation and Up-gradation of Lokhandi Sawargaon- Renapur(Latur) Road from existing km 32+225 to 66+693 (SH-232) (Design km. 32+225 to km 66+688) & Ambejogai Bypass from Existing/Design Chainage 0+000 to km 3+815 (SH 211) Two/Four lane with paved shoulders Configuration in the state of Maharashtra on EPC Mode.

Client : GR-Infra Projects Limited